Line 8 Culvert, Bradford West Gwillimbury, Ontario
KS Precast Engineering was responsible for the structural design of this skewed three-sided culvert. This culvert has a clear span of 7 meters. The design was performed in accordance with the Canadian Highway Bridge Design Code (CHBDC). The design incorporated a segmental block retaining wall on top of the culvert.
Project Details
DATE :
2016
Manufacturer :
M Con Pipe and Products
Owner :
Town of Bradford West Gwillimbury