Do You Have A Construction Project We Can Help With?

Line 8 Culvert, Bradford West Gwillimbury, Ontario

KS Precast Engineering was responsible for the structural design of this skewed three-sided culvert. This culvert has a clear span of 7 meters. The design was performed in accordance with the Canadian Highway Bridge Design Code (CHBDC). The design incorporated a segmental block retaining wall on top of the culvert.

Project Details

DATE :

2016

Manufacturer :

M Con Pipe and Products

Owner :

Town of Bradford West Gwillimbury

Project Gallery

Contact Now

    FIRST NAME *

    LAST NAME *

    EMAIL ADDRESS *

    PHONE NUMBER

    SUBJECT

    HOW CAN WE HELP?